Significant upgrades to the utilities and infrastructure at the Dorado site have been completed by Biovail over the past few years. Major systems that have been added or replaced since 2005 include:
- New Chiller Plant with expansion bay
- New 3750 KVA Substation
- New Emergency Generators
- New Boilers with expansion bay

- Upgraded DI Water System
A list of the major utilities equipment and their capacities include:
| Equipment |
Brand |
Capacity |
Remarks |
Power |
Transformers |
|
3750 KVA |
Redundant Substation |
Emergency Generators (2) |
Cummings |
1875 KVA 480 VAC (each) |
Model 1500 DFLE-4397 |
Compressed Air |
Air Compressors 1 & 2 |
Atlas Copco |
550 CFM |
ZR3-CE |
Air Compressor 3 |
Atlas Copco |
600 CFM |
ZR3-66-125 |
Chillers |
Chillers 1 & 2 |
Trane |
800 Tons (each) |
Model CVHF910 |
Cooling Towers |
Cooling Towers 1 & 2 |
Evapco |
800 Tons (each) |
Model VBT24-318B |
Steam |
Boilers 1 & 2 |
Cleaver Brooks |
200 HP (each) |
Model CB-101-200-150 |

|